6 months of construction considerations

Construction work must be "warm"

In winter, when the temperature is low and the plastering, scraping, and tiling are frozen, hollowing and other problems will occur. In particular, when painting paint, it is necessary to pay attention to “warmth”. After the paint is fully dried, the doors and windows can be opened and ventilated, and sand can not be allowed to fall on the undried paint surface. Service Network home improvement experts reminded that whether it is mixing mortar, or spray a variety of paint, it is best not to open the construction.

Prevent dry and dampness on both sides

Winter decoration, the impact on wood is mainly reflected in both temperature and humidity. If the temperature is too low or too high, it will cause adverse reactions to the wood, curling or even cracking. In particular, various types of products in various types of companies in the current timber market have a wide range of products and their qualities are uneven. It is suggested that consumers should choose some of the more well-known brands. In addition, service network home improvement experts reminded that the main materials should be prepared in advance, and it is best to place in the heating equipment room for 3 to 5 days, so that the moisture content of wood close to the level of the house to prevent future deformation. In addition, after wood is transported into the decoration site, it should be avoided to put it in a ventilated place, otherwise the air drying will quickly lose its internal moisture and cracks appear. When the humidity is low, it is necessary to reduce the ventilation, and put a pot of water near the heating facilities to promote evaporation, so that the wood can safely survive the winter.

Wood products sealed in time

In winter, the wood is easily brittle and cracking may not be visible at the beginning. However, if the sealing work of the paint worker is not timely, it is easy to cause cracks on the veneer surface of the veneer, which affects the aesthetics and its service life. For the wood line used as the edge, the moisture content is higher than that of the veneer. After the processing is completed, the surface should be sealed with oil as soon as possible, otherwise shrinkage will occur, which will affect the appearance of the veneer.

Do not forget the expansion joints on the wooden floor

In the winter when the air is dry, when workers lay wooden floors, an expansion joint of about 2 mm is indispensable, otherwise drums and dangling will easily occur in the future. If there is a phenomenon such as leakage of heat from the heater or accumulation of water on the wooden floor, it must be wiped in a timely manner. Do not allow it to be exposed to direct sunlight or baked in an electric oven to avoid excessive drying and cracking of the floor. In order to prevent deformation, the floor on both sides of the wall can be dismantled, and the moisture can be dispersed before reinstalling.

Change outside window and save time

Many homes will replace ordinary windows or aluminum alloy windows with plastic steel windows during renovations. Some installation workers have plans to save time. The fixing of plastic steel windows is not very solid. This will cause the outer window to be blown or deformed by the wind, and will be slid later. It will become difficult to open, and it will cause rain to flow into the room in case of rain. Therefore, the external window must be closely inspected, and secondly, whether the cement mortar around the sealed external window is tight or not. Otherwise, it will cause the room to leak.

Del floor nature floor window paint home improvement interior room floor tile floor tile

1m Mini Measuring Tape

1M Mini Measuring Tape,Small Retractable Tape Measure,Precision Tape Measure,Tape Measure Scale

SHANGQIU CHAOYUE MEASURING TOOLS CO., LTD , https://www.equipmentool.com

This entry was posted in on