In the bathroom waterproofing project, there will be a scene where the bathroom waterproofing is not done well. At this time, many owners will be very anxious about how to do a good job of waterproofing the bathroom , because it is not only related to their influence on the neighbors. Now let's take a look at the bathroom waterproof solution that I didn't do well. Let everyone know how to do a good job in bathroom waterproofing .

Waterproof bathroom is not done how to do - Solution:

Interconnect the old “drain and drain pipe from the top to the bottom” and connect the floor drain to the sewer pipe joints. Then add 1:1 cement mortar and 15% alumite expander for the cement content. , you can.

The original bathroom waterproof is the overall flexible waterproof, after moving here, "the use of cement slurry plus cement content of 20% of the alum stone expansion agent brushed at the mouth and the surrounding," will not affect other places later!

In addition, the floor drain of the bathtub is not used. After removing the tub and cutting out the interface of the sewer, remove the nozzle and plug it in with a 1:1 cement mortar and a 15% alumite expander for the cement content. .

What to do if the bathroom is not waterproof?

1. Alum stone expander, brownish red, where to sell the cement should be asked, the unit price is 500-800 yuan / ton, slightly more expensive than cement, but the amount is less.

2. If you buy more (buy up to 1 pack, 50 kg), then you can get rid of the floor tiles on the flexible waterproof layer of the original bathroom, use 1:1 cement mortar and 15-18% of alumite expansion agent with cement content Make up 1.5~2.0cm at the same time and reattach the tiles.

3, special attention is: "the ground in the corner with the wall, the upper part of the sewer mortar should do a good job," do the mortar before the grass roots should be cut hair, clean the dust, to the master of the low-level mortar concrete can not be loose or empty , Tightly and tightly, the mortar should not be too dry.

4, pay attention to do a good job two days later, so that after the future will not leak!

The related information on how to do the toilet waterproofing is introduced for everyone. I hope this article will help everyone. If you still have something you don't understand, you can leave a message to Xiaobian at the bottom. We will answer your questions as soon as possible.

Bathroom toilet waterproof

Adjustable Deck Pedestal

Adjustable Deck Pedestal,Taurus Adjustable Paver Pedestal,Adjustable Paver Plastic Pedestal,Self Level Deck Pedestal

Jiangxi Taurus Technology Co., Ltd , https://www.chinapedestal.com

This entry was posted in on