Management of steel waste


Management of steel and waste materials The existence of scrap steel waste will occupy certain sites and funds, affecting the normal operation of the production of the enterprise. Therefore, it is necessary to find out the cause of the waste generated, and prevent and deal with it to ensure the smooth progress of production.
1. What is the waste material (1). The material is too much, the amount of scrap steel is too much, the consumption is very small, and the scrap steel with extremely low inventory turnover rate is used. This scrap steel occasionally consumes a little. For example, many large scrap steel parts are purchased, and it cannot be processed at the time. So you can't use it in your childhood. It can't be used anymore. One hundred percent of the materials are available, and the original characteristics and functions of the materials are not lost at all, but they are left in the stockyard and are not used.
(2) Waste. The scrap of scrap steel refers to the unusable part. The “two wastes” are different. The former waste is the raw material; the latter waste is pure waste. That is, the material that loses its value. For example, impurities, non-conducting materials, etc., mixed into scrap steel.

2. Prevention and treatment of dead materials (1) Reasons for the production of dead materials.
There are many reasons for the occurrence of dead materials, and there are reasons for the occurrence of dead materials in various departments. These causes can be identified and analyzed before they can be prevented. The reasons for the occurrence of the material in the sub-sector are as follows.
1 The production planning department and the sales department are not well coordinated, causing frequent changes in production plans, resulting in the occurrence of dead materials.
2 The plan for scrap steel is improper, the management of the stockyard is poor, the stock is not properly controlled, and the material is produced.
3 improper procurement of scrap steel is not available.
4 There is no serious inspection of scrap steel, so that the scrap steel that is accepted has defective products, and these defective products become dead materials.
5 The market forecast is not good, so the sales plan is not allowed, so that the scrap steel prepared by the company cannot be used.
(2) Preventive measures for dead materials.
The prevention of dead materials is more important than the treatment. For the occurrence of dead materials, different preventive measures can be taken according to the nature of the department.





Article from Hong Kong waste recycling

Rubber Sole for work boots, labor protection shoes, electrical shoes. The whole sole of the sole is made of rubber, the advantage is wear-resistant and anti-skid, the general heavy industry more such as: shipbuilding, mechanical processing and so on.
Its advantages is good tear resistance.It is also able to withstand high temperature, ozone resistance, aging resistance, acid and alkali resistance and other chemical components, and has the performance of shock absorption and electrical insulation.

Rubber Sole

Rubber Sole,Rubber Shoe Sole,Safety Rubber Sole,High Ankle Rubber Sole

Greateagle Safety Products Co., Ltd. , http://www.greateaglesafety.com

This entry was posted in on